ING Renault F1 Team Sustainable Computational Aerodynamics Research Centre

December 22, 2009  
ING Renault F1 Team Computational Aerodynamics Research Centre - 1

Work began on site in the autumn of 2007. As site preparation and foundations were prepared ABM began casting and curing the segments. Site assembly began in December 2007 and was complete in just six working days, ahead of schedule.

ING Renault F1 Team Computational Aerodynamics Research Centre - 2

The entire structure has been waterproofed, backfilled with graded materials, earthed over and landscaped. To complete the construction the main contractor has enclosed one end wall to create an area for the server farm. In the centre of the building is the exhibition area and auditorium space. A full height glass curtain wall at the far end of the structure gives a panoramic view of a wild life area, creating a stunning backdrop for the office area.

The natural concrete finish has been retained as a building feature. Standard vault designs were modified in the centre of the building to include opposing semi-circular cut-outs that create four light wells. An opening in the side wall has been created from which a curved tunnel provides a dramatic entrance to the building. A full size Renault F1 Team car is displayed in the exhibition area.

ING Renault F1 Team Computational Aerodynamics Research Centre - 3 ING Renault F1 Team Computational Aerodynamics Research Centre - 4 ING Renault F1 Team Computational Aerodynamics Research Centre - 5 ING Renault F1 Team Computational Aerodynamics Research Centre - 6